Projects (as Main Contractor)


New Built Works Construction:

Residential Building, No. 4 Kent Road, Kowloon Tong

Residential Building, No. 147 Waterloo Road, Kowloon Tong

Composite Development at No.245-247,Tai Kok Tsui Road, Kowloon

Commercial Building, 40 Kimberley Road, Tsim Sha Tsui

Residential Building Works, 11 Sha Tin Ridge Road, Sha Tin

Seng Tak Central School Building Project, New Clear Water Road, Kowloon

Commercial Development 24A &24B Granville Road, Tsim Sha Tsui
No.8-12,
Yuen Long Pau Cheung Square, Yuen Long

Composite Building On K.I.L 11238 At Nos 445-447 Shangshui street, Kowloon

E&M Works Construction:

Sha Tin Fo Tan Data Center Project


Redecoration Work

Kau To Shan and Hong Lok Yuen South Bay, Shouson Hill, Mount Kellett and other luxury residential decoration.


和明以主承(chéng)建商的身份完成了
:

1.尖沙咀金巴利道40號商業大(dà)廈建築工程(整單所(suǒ)有項目)

2.香(xiāng)港(gǎng)觀塘新清水灣道重置(zhì)香港扶幼會盛(shèng)德中心學校(xiào)建築工程(整單所有項目)

3.香港沙田嶺道11號住宅建築工程

4.沙田火炭數(shù)據(jù)中心工程(機電設備連裝修)

5.九肚山(shān)以及康樂園南灣、壽臣山、加列(liè)等豪(háo)宅裝修等

6.大角咀道245-247號(hào)住宅大樓建築工程(整單所有(yǒu)項目)

7.九龍塘根德道4號單幢式住宅(zhái)

8.九龍塘窩打老道147號單幢式住宅

9.尖沙咀加連威老道24A&24B大廈(shà)

10.元朗炮仗坊 8-12

11.旺角上(shàng)海街445號住宅大(dà)

12. 屯門環保園廢紙(zhǐ)回收廠房及其他相關的(de)發展項目之(zhī)P1地段

Projects (as Sub Contractor)


Civil Engineering:

Hong Kong's Siu Sai Wan Park Drainage Project,

Government Development Department's Tin Shui Wai Wooden Bridge Project,

Tung Chung Road Extension Project, and other steel structures, pavements, channel works, concrete structures and drainage works.

Hong Kong Siu Sai Wan Park Steel Structure Project, Stainless Steel Project,

Phase III Reclamation 2009/19 project of the steel railing project, airport railway depot steel structure.


A&A Works Construction:

The renovation project of Sha Tin Railway Station including steel structure engineering and   reinforced concrete structure works.


Steel Structure Engineering

Shanghai Lu Pu Bridge Steel Structure Engineering.


Design and manufacture of installation works:

Mobile safety fence in the Wan Chai - Central Phase II reclamation works.



Other projects completed by the Company include:

Shatin Vista Paradiso external area ; site wooden & steel decoration work



土喷射性呕吐视频,性撸视频,色老头性视频在线观看,性潮喷视频程

1.香港小西灣公園渠務工程(chéng)A
2.政府拓展署天水圍(wéi)木橋工程
3.東涌路擴建工程中7公里的擋土墻工程
4.第三期(qī)填海2009/19的高速工程的防(fáng)撞欄工程(chéng)
5.機場(chǎng)鐵路油庫鋼(gāng)結(jié)構,鋼結構、路面、渠道(dào)工程、混凝土結構以及(jí)渠務(wù)工程
6.香(xiāng)港小(xiǎo)西灣海濱(bīn)公園鋼結構(gòu)工程、不銹(xiù)鋼工程(chéng)
7.加(jiā)建、改(gǎi)建工程:沙田火車站的改(gǎi)造工程包(bāo)括鋼結構(gòu)工程、鋼筋(jīn)混凝結構(gòu)工(gōng)
8.鋼(gāng)結構工程:上海盧浦大橋鋼結構工程(chéng)
9.設計與制造(zào)安裝工程-灣仔(zǎi)至中環第二期填海工程中(zhōng)的(de)移動式(shì)安全圍(wéi)欄的(de)設計(jì)、制造工程

其他工程

沙田聽濤雅苑外欄&裝飾工程(chéng)(木器鐵器)